|
|
Log of Updates/Changes to SCCF Web Pages
18 July 2003
- Updated GOES3 eclipse predictions .
10 Junel 2003
- Updated Sustaining Engineering documents on documents page.
23 April 2003
- Updated SOP and PMP documents on documents page.
7 April 2003
- Updated monthly updates for GOES-3 health and status information
to the telemetry page.
These updates include quality controlled orbital elements,
daily average longitude, drift rate, and attitude for GOES-3.
28 March 2003
- Updated COP document on documents page.
18 Feb 2003
- Updated the personnel on the management
page.
19 Jan 2003
- Posted eclipse predictions
for winter/spring 2003 for GOES3.
7 Jan 2003
- Updated monthly updates for GOES-3 health and status information
to the telemetry page.
These updates include quality controlled orbital elements,
daily average longitude, drift rate, and attitude for GOES-3.
- Restarted current link status
pages with new IP addresses.
Changes in 2002
- o Updates for 2002 are listed on
a separate page.
Changes in 2001
- o Updates for 2001 are listed on
a separate page.
Changes in 2000
- o Updates for 2000 are listed on
a separate page.
|
|