|
|
Log of Updates/Changes to SCCF Web Pages
2 Sept 2002
- Added monthly updates for GOES-3 health and status information
to the telemetry page.
These updates include quality controlled orbital elements,
daily average longitude, drift rate, and attitude for GOES-3.
9 Jun 2002
- Added eclipse predictions
for GOES-3 for Summer/Fall 2002.
1 Jun 2002
- Uploaded the June 2002 version of the Sustaining Engineering
Document. Available on the Documents page.
28 May 2002
- Added les 9 and earth viewer links to the links
page.
1 May 2002
- Updated the SOP and PMP documents (see the
On Line Documents Page).
- Corrected a few lingering MSOC->RSOC changes.
5 Apr 2002
- Completed various updates related to Malabar-Richmond transition.
Redirected site from www.rsmas.miami.edu to ice.rsmas.miami.edu.
4 Jan 2002
- Updated the router traffic page
to plot data from Richmond rather than Malabar.
Changes in 2001
- o Updates for 2001 are listed on
a separate page.
Changes in 2000
- o Updates for 2000 are listed on
a separate page.
|
|