SCCF: Reference

SCCF Contents

 
SCCF Home
 
Operations
Overview
Management
Partners
 
Customer Services
Access Schedule
Telemetry
Log & Trouble Tickets
Special Service
Technical Support
 
Reference
Links
Updates&Changes

 


RSMAS Home

Log of Updates/Changes to SCCF Web Pages

7 Dec 2000

o Added plots for the GOES transportable units to the router traffic page.

6 Dec 2000

o Added link to ITASE
o Added nettles.spole.gov (SPTR router at pole) to the current link status pages.
o Added Pole and Palmer Graphic Access Schedules.
o Updated the pole and palmer summary pages with graphic access tables, more time zones and link status to the nettles router (for Pole).

30 Nov 2000

o Added access schedules for MARISAT-2 at the pole, and the two GOES portable units (ICE STREAM C) and (ITASE).
o Added guest access to On Line Documents.

28 Nov 2000

o Updated the Sustaining Engineering Descriptions from draft outline to draft version December 1, 2000. See the Staff Only pages.

15 Nov 2000

o Added a link from the performance page to the PMDF Monitor, which shows the number of email messages delivered and in the queue for delivery to Pole/Palmer.
o Added the current WART Access Schedule for TDRS-1.

09 Nov 2000

o Added a few more satellite ID numbers to table on the Access Schedule page so it would be easier to use NASA's overpass predictor.

03 Nov 2000

o Added pole and palmer summary pages, which provide a quick look at data from the performance and link status pages.
o Updated the MSOC Concept of Operations Plan on the staff only pages to the December 2000 version.

01 Nov 2000

o Added a link on the access schedule page to NASA's Satellite Overpass Predictor.

20 Oct 2000

o Updated the MSOC Standard Operating Procedures and Preventive Maintenance Plan documents on the staff only pages to Dec, 2000 versions.

18 Oct 2000

o Updated the router traffic page to reflect the new router installed at Malabar yesterday.

02 Oct 2000

o Added NSI link to the Current Link Status page.

27 Sep 2000

o Added pings to UM internet connections to the Current Link Status page.

21 Sep 2000

o Upgraded the log & trouble ticket pages so we can log specifically which services are out for a given problem
o Added the MSOC Downtime Statistics pages. (Which for the moment are password protected).

20 Sep 2000

o Added Current Link Status pages.

17 Sep 2000

o Added the SPTR TDRS-1 schedule.
o Added the PMDF monitor under the staff only pages.

14 Sep 2000

o Added the MSOC Standard Operating Procedures, Draft Sustaining Engineering Descriptions, and Draft Preventive Maintenance Plan documents to the staff only pages.

06 Sep 2000

o Added orbit predictions for ATS-3 for Pole and Palmer Station.

05 Sep 2000

o Added a comment on the Router Traffic page describing the time zone used for the plots (Eastern Time) and how to convert to UTC.

24 Aug 2000

o Added LES-9 statistics/uptime to Performance pages. Note, at this time, the LES-9 performance is for a combined Pole/Palmer signal.
o Added Updates & Changes page.
o Changed logo from this to this.

21 Aug 2000

o Updated telemetry page to add link to the java version of GOES-tv.

18 Aug 2000

o Added access schedules for ATS-3 and TDRS-1.
o Added link to South Pole TDRSS Relay (SPTR).

17 Aug 2000

o Pages posted at: http://www.rsmas.miami.edu/groups/rrsl/sccf/.